BOOK-CHAPTER

Shop Floor Scheduling: Single-Stage Problems

Keywords:
Computer science Scheduling (production processes) Schedule Single-machine scheduling Due date Single stage Production planning Sequence (biology) Operations research Industrial engineering Production (economics) Job shop scheduling Operations management Engineering Operating system Economics

Metrics

0
Cited By
0.00
FWCI (Field Weighted Citation Impact)
10
Refs
0.17
Citation Normalized Percentile
Is in top 1%
Is in top 10%

Topics

Scheduling and Optimization Algorithms
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering
Advanced Manufacturing and Logistics Optimization
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering
Assembly Line Balancing Optimization
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering

Related Documents

BOOK-CHAPTER

Shop Floor Scheduling: Multi-stage Problems

Yuri Mauergauz

Year: 2016 Pages: 447-483
JOURNAL ARTICLE

Job Shop-Scheduling Problems- Single Process

Ramezan Ali Mahdavinejad

Journal:   Applied Mechanics and Materials Year: 2010 Vol: 44-47 Pages: 330-334
JOURNAL ARTICLE

Agent-based shop-floor scheduling of multi stage systems

Alessandro BrunAlberto Portioli Staudacher

Journal:   Computers & Industrial Engineering Year: 1999 Vol: 37 (1-2)Pages: 457-460
JOURNAL ARTICLE

Computerized shop floor scheduling

Eliyahu M. Goldratt

Journal:   International Journal of Production Research Year: 1988 Vol: 26 (3)Pages: 443-455
JOURNAL ARTICLE

Real-time scheduling of multi-stage flexible job shop floor

Myoungsoo HamYoung Hoon LeeSun Hoon Kim

Journal:   International Journal of Production Research Year: 2010 Vol: 49 (12)Pages: 3715-3730
© 2026 ScienceGate Book Chapters — All rights reserved.