Job Shop-Scheduling Problems- Single Process

Ramezan Ali Mahdavinejad

Year: 2010 Journal:   Applied Mechanics and Materials Vol: 44-47 Pages: 330-334   Publisher: Trans Tech Publications

Abstract

In this paper, single-processors jobshop scheduling problems are solved by a heuristic algorithm based on the hybrid of priority dispatching rules according to an ant colony optimization algorithm. The objective function is to minimize the makespan, i.e. total completion time, in which a simultanous presence of various kinds of ferons is allowed. The process of finding the best solution will be improved by using the suitable hybrid of priority dispatching rules. Ant colony optimization algorithm, not only promote the ability of this proposed algorithm, but also decreases the total working time because of decreasing in setup times and modifying the working production line. By solving some problems as samples (i.e. Fisher's & Thomson's problems), this algorithm is compared with the others. The results show that when the size of the problem becomes lorger, the deviation from lower limit increases, but its rate decreases with the size of the problems, so that it reaches to its limit.

Keywords:
Job shop scheduling Mathematical optimization Limit (mathematics) Ant colony optimization algorithms Scheduling (production processes) Computer science Time limit Heuristic Process (computing) Mathematics Engineering Schedule

Metrics

0
Cited By
0.00
FWCI (Field Weighted Citation Impact)
6
Refs
0.13
Citation Normalized Percentile
Is in top 1%
Is in top 10%

Topics

Scheduling and Optimization Algorithms
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering
Advanced Manufacturing and Logistics Optimization
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering
Optimization and Packing Problems
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering

Related Documents

BOOK-CHAPTER

Shop Floor Scheduling: Single-Stage Problems

Yuri Mauergauz

Year: 2016 Pages: 405-445
BOOK-CHAPTER

Shop Scheduling Problems

Peter Brucker

Year: 2001 Pages: 155-239
BOOK-CHAPTER

Shop Scheduling Problems

Peter Brucker

Year: 1995 Pages: 143-224
BOOK-CHAPTER

Shop Scheduling Problems

Peter Brucker

Year: 2004 Pages: 155-239
BOOK-CHAPTER

Shop Scheduling Problems

Year: 2007 Pages: 155-241
© 2026 ScienceGate Book Chapters — All rights reserved.