JOURNAL ARTICLE

Agent-based shop-floor scheduling of multi stage systems

Alessandro BrunAlberto Portioli Staudacher

Year: 1999 Journal:   Computers & Industrial Engineering Vol: 37 (1-2)Pages: 457-460   Publisher: Elsevier BV
Keywords:
Scheduling (production processes) Computer science Distributed computing Fair-share scheduling Two-level scheduling Dynamic priority scheduling Architecture Flow shop scheduling Real-time computing Engineering Operations management Computer network

Metrics

8
Cited By
0.00
FWCI (Field Weighted Citation Impact)
11
Refs
0.24
Citation Normalized Percentile
Is in top 1%
Is in top 10%

Citation History

Topics

Scheduling and Optimization Algorithms
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering
Distributed and Parallel Computing Systems
Physical Sciences →  Computer Science →  Computer Networks and Communications
Advanced Manufacturing and Logistics Optimization
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering

Related Documents

JOURNAL ARTICLE

Multi-agent-based fuzzy scheduling for shop floor

Ying LiZheng Jia-qiangShanlin Yang

Journal:   The International Journal of Advanced Manufacturing Technology Year: 2009 Vol: 49 (5-8)Pages: 689-695
BOOK-CHAPTER

Agent-Based Shop Floor Scheduling

Martin KlímaJan GregorOndřej HarcubaVladimı́r Mařı́k

Lecture notes in computer science Year: 2017 Pages: 24-36
BOOK-CHAPTER

Shop Floor Scheduling: Multi-stage Problems

Yuri Mauergauz

Year: 2016 Pages: 447-483
BOOK-CHAPTER

Job Shop Scheduling using Multi-Agent Systems

A. Murray Booth

Year: 2004 Pages: 149-160
BOOK-CHAPTER

Shop Floor Scheduling: Single-Stage Problems

Yuri Mauergauz

Year: 2016 Pages: 405-445
© 2026 ScienceGate Book Chapters — All rights reserved.