BOOK-CHAPTER

Agent-Based Shop Floor Scheduling

Martin KlímaJan GregorOndřej HarcubaVladimı́r Mařı́k

Year: 2017 Lecture notes in computer science Pages: 24-36   Publisher: Springer Science+Business Media
Keywords:
Computer science Heuristics Solver Scalability Job shop scheduling Scheduling (production processes) Mathematical optimization Constraint (computer-aided design) Distributed computing Mathematics Database

Metrics

4
Cited By
2.04
FWCI (Field Weighted Citation Impact)
7
Refs
0.88
Citation Normalized Percentile
Is in top 1%
Is in top 10%

Citation History

Topics

Scheduling and Optimization Algorithms
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering
Advanced Manufacturing and Logistics Optimization
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering
Assembly Line Balancing Optimization
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering

Related Documents

JOURNAL ARTICLE

Multi-agent-based fuzzy scheduling for shop floor

Ying LiZheng Jia-qiangShanlin Yang

Journal:   The International Journal of Advanced Manufacturing Technology Year: 2009 Vol: 49 (5-8)Pages: 689-695
JOURNAL ARTICLE

Agent-based shop-floor scheduling of multi stage systems

Alessandro BrunAlberto Portioli Staudacher

Journal:   Computers & Industrial Engineering Year: 1999 Vol: 37 (1-2)Pages: 457-460
JOURNAL ARTICLE

Computerized shop floor scheduling

Eliyahu M. Goldratt

Journal:   International Journal of Production Research Year: 1988 Vol: 26 (3)Pages: 443-455
JOURNAL ARTICLE

Real time distributed shop floor scheduling using an agent-based service-oriented architecture

Chun WangHamada GhenniwaWeiming Shen

Journal:   International Journal of Production Research Year: 2008 Vol: 46 (9)Pages: 2433-2452
© 2026 ScienceGate Book Chapters — All rights reserved.