JOURNAL ARTICLE

Computerized shop floor scheduling

Eliyahu M. Goldratt

Year: 1988 Journal:   International Journal of Production Research Vol: 26 (3)Pages: 443-455   Publisher: Taylor & Francis

Abstract

Computerized shop floor scheduling is probably one of the most glaring examples of an area in which the tremendous efforts and investments of a large number of companies have produced at best only a partial solution. One of the more successful attempts is known as OPTR (optimized production technology) on which numerous papers have been published highlighting the various aspects of this package. What was realized by only a small group of people, namely the user base, was that this package was evolving at an incredible rate from one year to the next. This article describes that evolutionary process from basically a computerized Kanban to an attempted computerization of the Drum-Buffer-Rope technique. The major emphasis will not be so much on the technical developments, but more on the reasoning—gained from the experience of implementing this package—that brought this evolution so quickly to its ultimate conclusion. Namely, the real key lies mainly in the conceptual framework under which we run our organizations.

Keywords:
Scheduling (production processes) Kanban Rope Computer science Operations research Process (computing) Key (lock) Industrial engineering Engineering Process management Manufacturing engineering Operations management Artificial intelligence Computer security Operating system

Metrics

275
Cited By
21.68
FWCI (Field Weighted Citation Impact)
1
Refs
1.00
Citation Normalized Percentile
Is in top 1%
Is in top 10%

Citation History

Topics

Scheduling and Optimization Algorithms
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering

Related Documents

BOOK-CHAPTER

Agent-Based Shop Floor Scheduling

Martin KlímaJan GregorOndřej HarcubaVladimı́r Mařı́k

Lecture notes in computer science Year: 2017 Pages: 24-36
JOURNAL ARTICLE

STUDY ON SHOP-FLOOR SCHEDULING

Ting He

Journal:   Journal of Mechanical Engineering Year: 2000 Vol: 36 (05)Pages: 97-97
BOOK-CHAPTER

The Shop Floor Scheduling Game

Jan RiezebosJannes Slomp

IFIP advances in information and communication technology Year: 1995 Pages: 117-124
BOOK-CHAPTER

Shop Floor Scheduling: Single-Stage Problems

Yuri Mauergauz

Year: 2016 Pages: 405-445
BOOK-CHAPTER

Shop Floor Scheduling: Multi-stage Problems

Yuri Mauergauz

Year: 2016 Pages: 447-483
© 2026 ScienceGate Book Chapters — All rights reserved.