JOURNAL ARTICLE

Real-time scheduling of multi-stage flexible job shop floor

Myoungsoo HamYoung Hoon LeeSun Hoon Kim

Year: 2010 Journal:   International Journal of Production Research Vol: 49 (12)Pages: 3715-3730   Publisher: Taylor & Francis

Abstract

Abstract This paper first formulates a binary integer programming (BIP) model that minimises C max for a multi-stage flexible job shop floor with machine compatibility. Due to a computational limitation, the exact optimal model is then relaxed as a linear programming model. The output from the relaxation model then turns into the objective of the BIP-based real-time scheduling (RTS) heuristic model. The RTS heuristic requires an iteration to calculate the final C max. At each iteration, the RTS heuristic assigns just one job to the earliest available machines. Since the set of jobs and machines included in the RTS model is relatively small, RTS can be solved in a very short computational time. We evaluate an overall effectiveness (in terms of solution quality and run time) of the RTS heuristic by way of computer experiments. Keywords: job shopinteger programmingmulti-stageoptimisationreal-timescheduling

Keywords:
Mathematical optimization Computer science Integer programming Scheduling (production processes) Heuristic Job shop scheduling Set (abstract data type) Linear programming Algorithm Mathematics Schedule

Metrics

32
Cited By
4.87
FWCI (Field Weighted Citation Impact)
24
Refs
0.94
Citation Normalized Percentile
Is in top 1%
Is in top 10%

Citation History

Topics

Scheduling and Optimization Algorithms
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering
Advanced Manufacturing and Logistics Optimization
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering
Optimization and Search Problems
Physical Sciences →  Computer Science →  Computer Networks and Communications

Related Documents

BOOK-CHAPTER

Shop Floor Scheduling: Multi-stage Problems

Yuri Mauergauz

Year: 2016 Pages: 447-483
JOURNAL ARTICLE

Agent-based shop-floor scheduling of multi stage systems

Alessandro BrunAlberto Portioli Staudacher

Journal:   Computers & Industrial Engineering Year: 1999 Vol: 37 (1-2)Pages: 457-460
JOURNAL ARTICLE

Real-time dynamic shop floor scheduling using Evolutionary Algorithms

Joachim KäschelTobias TeichBernd Zacher

Journal:   International Journal of Production Economics Year: 2002 Vol: 79 (2)Pages: 113-120
BOOK-CHAPTER

Shop Floor Scheduling: Single-Stage Problems

Yuri Mauergauz

Year: 2016 Pages: 405-445
© 2026 ScienceGate Book Chapters — All rights reserved.