JOURNAL ARTICLE

Multi-UAV continuous power inspection scheduling algorithm based on NSGA-III

Keywords:
Computer science Scheduling (production processes) Algorithm Real-time computing Mathematical optimization Mathematics

Metrics

0
Cited By
0.00
FWCI (Field Weighted Citation Impact)
7
Refs
0.29
Citation Normalized Percentile
Is in top 1%
Is in top 10%

Topics

Power Line Inspection Robots
Physical Sciences →  Engineering →  Mechanical Engineering
Industrial Vision Systems and Defect Detection
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering

Related Documents

JOURNAL ARTICLE

Research on multi-objective flow shop scheduling problem based on improved NSGA-III algorithm

Xi ZhangYuxing Wang

Journal:   Proceedings of the 2021 5th International Conference on Electronic Information Technology and Computer Engineering Year: 2021 Pages: 1183-1188
© 2026 ScienceGate Book Chapters — All rights reserved.