BOOK

Time-Related Incentive and Disincentive Provisions in Highway Construction Contracts

Abstract

This report will be of interest to state and local highway agency construction managers and contractors with regard to learning about best practices of time-related incentive and disincentive contract provisions and their effect on staffing levels, productivity, project cost, quality, contract administration, and the contractor's operations and innovations. The report also presents a decision process guide to use as a template for crafting the incentive/disincentive provisions.

Keywords:
Incentive Business Transport engineering Engineering Finance Construction engineering Economics Microeconomics

Metrics

22
Cited By
2.69
FWCI (Field Weighted Citation Impact)
0
Refs
0.90
Citation Normalized Percentile
Is in top 1%
Is in top 10%

Citation History

Topics

BIM and Construction Integration
Physical Sciences →  Engineering →  Building and Construction
Underground infrastructure and sustainability
Physical Sciences →  Engineering →  Building and Construction
Construction Project Management and Performance
Social Sciences →  Decision Sciences →  Management Science and Operations Research

Related Documents

JOURNAL ARTICLE

Incentive/Disincentive Provisions in Highway Contracts

David ArditiC. Jotin KhistyFiruzan Yasamis

Journal:   Journal of Construction Engineering and Management Year: 1997 Vol: 123 (3)Pages: 302-307
JOURNAL ARTICLE

Incentive/Disincentive Guidelines for Highway Construction Contracts

Majid JaraiediRalph W. PlummerMary S. Aber

Journal:   Journal of Construction Engineering and Management Year: 1995 Vol: 121 (1)Pages: 112-120
JOURNAL ARTICLE

Setting Maximum Incentive for Incentive/Disincentive Contracts for Highway Projects

Jin-Fang ShrWei Tong Chen

Journal:   Journal of Construction Engineering and Management Year: 2004 Vol: 130 (1)Pages: 84-93
JOURNAL ARTICLE

Determination of Contract Time and Incentive and Disincentive Values of Highway Construction Projects

Yi JiangHuaxin ChenShuo Li

Journal:   International Journal of Construction Education and Research Year: 2010 Vol: 6 (4)Pages: 285-302
JOURNAL ARTICLE

Refocusing on Liquidated Damages in Incentive/Disincentive Contracts

Carlos SunPraveen EdaraAndrew Mackley

Journal:   Journal of Legal Affairs and Dispute Resolution in Engineering and Construction Year: 2013 Vol: 5 (3)Pages: 136-141
© 2026 ScienceGate Book Chapters — All rights reserved.