Year: 2004 Journal:   Journal of Construction Engineering and Management Vol: 130 (1)Pages: 84-93   Publisher: American Society of Civil Engineers

Abstract

An increasing number of State Highway Agencies (SHAs) are utilizing Incentive/Disincentive (I/D) bidding for highway construction. The I/D bidding concept is designed to shorten the total contract time by giving the contractor an incentive for early completion and a disincentive for late completion of a project. SHAs are then presented with the problem of determining the maximum incentive that may be awarded to the contractor. This maximum incentive amount is affected by construction cost, time, and the incentive/disincentive formula. Many SHAs use a fixed amount or fixed percent of construction cost as a maximum incentive amount. However, overestimation of the maximum incentive amount may waste public money and underestimation will reduce the effectiveness of the incentive. This research offers a quantifying model to determine a reasonable maximum incentive amount and uses projects from the Florida Department of Transportation (FDOT) to illustrate this model that is only suitable for linear I/D. A functional relationship between the construction cost and time duration is developed from the FDOT's data. The curve with the functional relationship between the construction cost and time duration is then combined with the incentive/disincentive line to determine the optimum maximum days for incentive and incentive amount. Finally, several projects completed by the FDOT will be used to illustrate the validity of this model.

Keywords:
Incentive Bidding Incentive program Duration (music) Economics Business Microeconomics

Metrics

63
Cited By
8.23
FWCI (Field Weighted Citation Impact)
4
Refs
0.97
Citation Normalized Percentile
Is in top 1%
Is in top 10%

Citation History

Topics

BIM and Construction Integration
Physical Sciences →  Engineering →  Building and Construction
Construction Project Management and Performance
Social Sciences →  Decision Sciences →  Management Science and Operations Research

Related Documents

JOURNAL ARTICLE

Incentive/Disincentive Provisions in Highway Contracts

David ArditiC. Jotin KhistyFiruzan Yasamis

Journal:   Journal of Construction Engineering and Management Year: 1997 Vol: 123 (3)Pages: 302-307
JOURNAL ARTICLE

Incentive/Disincentive Guidelines for Highway Construction Contracts

Majid JaraiediRalph W. PlummerMary S. Aber

Journal:   Journal of Construction Engineering and Management Year: 1995 Vol: 121 (1)Pages: 112-120
JOURNAL ARTICLE

Incentive/disincentive contracts and its effects on industrial projects

Abdulaziz A. Bubshait

Journal:   International Journal of Project Management Year: 2002 Vol: 21 (1)Pages: 63-70
BOOK-CHAPTER

Incentive/Disincentive Contracting Practices for Transportation Projects

David N. SillarsJean Pol Armijos Leray

American Society of Civil Engineers eBooks Year: 2006 Pages: 129-152
© 2026 ScienceGate Book Chapters — All rights reserved.