JOURNAL ARTICLE

Branch and bound algorithm for solving blocking flowshop scheduling problem with total tardiness and total weighted tardiness criteria

Saïd ToumiBassem JarbouiMansour EddalyAbdelwaheb Rebaï

Year: 2017 Journal:   International Journal of Operational Research Vol: 30 (4)Pages: 441-441   Publisher: Inderscience Publishers

Abstract

This paper addresses the scheduling of a permutation flowshop scheduling problem with blocking constraints to minimise the total tardiness and total weighted tardiness with a branch and bound algorithm. New machine-based lower bound was developed for the problem. The experimental results on both criteria have shown the efficiency of the proposed algorithm both in terms of solutions quality and time requirements.

Keywords:
Tardiness Branch and bound Scheduling (production processes) Computer science Mathematical optimization Job shop scheduling Blocking (statistics) Upper and lower bounds Retard Algorithm Mathematics Schedule

Metrics

7
Cited By
1.25
FWCI (Field Weighted Citation Impact)
0
Refs
0.84
Citation Normalized Percentile
Is in top 1%
Is in top 10%

Citation History

Topics

Scheduling and Optimization Algorithms
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering
Advanced Control Systems Optimization
Physical Sciences →  Engineering →  Control and Systems Engineering
Process Optimization and Integration
Physical Sciences →  Engineering →  Control and Systems Engineering
© 2026 ScienceGate Book Chapters — All rights reserved.