JOURNAL ARTICLE

Branch and bound algorithm for solving blocking flowshop scheduling problem with total tardiness

Abstract

This paper addresses to the scheduling of a permutation flowshop scheduling problem with blocking constraints to minimize the total tardiness with a branch and bound algorithm. New machine based lower bound was developed for the problem. The experimental results have shown the efficiency of the proposed algorithm both in terms of solutions quality and time requirements.

Keywords:
Tardiness Job shop scheduling Branch and bound Computer science Scheduling (production processes) Mathematical optimization Upper and lower bounds Blocking (statistics) Flow shop scheduling Algorithm Mathematics Schedule

Metrics

0
Cited By
0.00
FWCI (Field Weighted Citation Impact)
4
Refs
0.19
Citation Normalized Percentile
Is in top 1%
Is in top 10%

Topics

Scheduling and Optimization Algorithms
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering
Advanced Control Systems Optimization
Physical Sciences →  Engineering →  Control and Systems Engineering
Optimization and Search Problems
Physical Sciences →  Computer Science →  Computer Networks and Communications
© 2026 ScienceGate Book Chapters — All rights reserved.