JOURNAL ARTICLE

Client and contractor roles in schedule incentive/disincentive projects

Abid HasanKumar Neeraj Jha

Year: 2019 Journal:   Engineering Construction & Architectural Management Vol: 26 (3)Pages: 386-407   Publisher: Emerald Publishing Limited

Abstract

Purpose Delays in construction projects can be very expensive due to their adverse effects on project cost and profit margin. To overcome this problem, clients in the construction industry sometimes use schedule incentive/disincentive (I/D) contracting strategy. However, previous studies have shown that inadequate understanding and wrong implementation of schedule I/D provisions could result in unintended results. Moreover, the use of the I/D contracting method is in its initial stages in many countries such as India. The purpose of this paper is to identify various factors that are essential for schedule I/D success in construction projects. Design/methodology/approach A questionnaire survey was conducted among experienced professionals (clients, contractors and consultants) from across the Indian construction industry. Findings Top success factors related to clients in the descending order of their importance are: realistic targets; detailed guidelines for I/D implementation; close coordination with other stakeholders; correct estimation of I/D duration and amount; and imposing disincentives after due consideration. Meanwhile, factors related to contractor organisations are: continuous monitoring and control; thorough understanding of schedule I/D targets; specific considerations in appointing senior project personnel; effective communication; and proper labour management. Research limitations/implications This empirical research was conducted in the Indian construction industry. Similar studies from developed construction markets may provide more insights into the successful use of schedule I/D provisions in construction projects. Practical implications The uptake of these recommendations is likely to increase the success of schedule I/D provisions in construction projects, especially in developing countries where the use of I/D contracting strategy is not very popular. Originality/value This research highlights the specific roles of both clients and contractors in the success of schedule I/D projects in developing countries such as India.

Keywords:
Schedule Incentive Business Project management Order (exchange) Integrated project delivery Construction industry Control (management) Operations management Profit (economics) Estimation Profit margin Unintended consequences Duration (music) Marketing Finance Economics Engineering Management Construction engineering

Metrics

16
Cited By
2.10
FWCI (Field Weighted Citation Impact)
71
Refs
0.87
Citation Normalized Percentile
Is in top 1%
Is in top 10%

Citation History

Topics

Construction Project Management and Performance
Social Sciences →  Decision Sciences →  Management Science and Operations Research
Outsourcing and Supply Chain Management
Social Sciences →  Business, Management and Accounting →  Management Information Systems
Quality and Supply Management
Social Sciences →  Business, Management and Accounting →  Management Information Systems

Related Documents

BOOK-CHAPTER

Incentive/Disincentive Contracting Practices for Transportation Projects

David N. SillarsJean Pol Armijos Leray

American Society of Civil Engineers eBooks Year: 2006 Pages: 129-152
JOURNAL ARTICLE

Setting Maximum Incentive for Incentive/Disincentive Contracts for Highway Projects

Jin-Fang ShrWei Tong Chen

Journal:   Journal of Construction Engineering and Management Year: 2004 Vol: 130 (1)Pages: 84-93
JOURNAL ARTICLE

Quantitative model for determining incentive/disincentive amounts through schedule simulations

Kunhee ChoiYoung Hoon KwakByunggu Yu

Journal:   Proceedings of the 2010 Winter Simulation Conference Year: 2010 Pages: 3295-3306
JOURNAL ARTICLE

Incentive/disincentive contracts and its effects on industrial projects

Abdulaziz A. Bubshait

Journal:   International Journal of Project Management Year: 2002 Vol: 21 (1)Pages: 63-70
© 2026 ScienceGate Book Chapters — All rights reserved.