JOURNAL ARTICLE

Avoided Costs: Ontario Hydro's Experience

Amir Shalaby

Year: 1989 Journal:   IEEE Power Engineering Review Vol: 9 (2)Pages: 48-48   Publisher: Institute of Electrical and Electronics Engineers

Abstract

Ontario Hydro regularly estimates avoided costs primarily for use in evaluating some design, operating, planning and domestic marketing alternatives. Avoided costs reflect increased or decreased use of existing facilities or the cost of delaying or advancing additional resources. The avoided costs are estimated to be about 2 cents/kW.h (in $1988) to the mid 1990s. Costs increase to 3 or 4 cents/ kW.h towards the late 90s (in $1988) as the nuclear construction program is completed and acid gas emission regulations become more costly to meet. By necessity, a lot of simplifications must be made in the calculation of avoided costs. Simplifications are necessary to approximate the complex nature of operating and planning a power system. As in many other jurisdictions, regulatory and policy making bodies in Ontario and developers of cogeneration and small hydro are interested in calculations of avoided costs. This paper briefly describes Ontario Hydro's experience in developing avoided costs: the methods, the assumptions, the results, and the difficulties.

Keywords:
Hydro power Nuclear power Cogeneration Environmental economics Business Marginal cost Operations management Economics Power (physics) Risk analysis (engineering) Electricity generation Engineering Microeconomics Environmental engineering

Metrics

10
Cited By
0.00
FWCI (Field Weighted Citation Impact)
3
Refs
0.29
Citation Normalized Percentile
Is in top 1%
Is in top 10%

Citation History

Topics

Canadian Policy and Governance
Social Sciences →  Social Sciences →  Political Science and International Relations
Offshore Engineering and Technologies
Physical Sciences →  Engineering →  Ocean Engineering
Diverse Research and Applications
Physical Sciences →  Computer Science →  Information Systems

Related Documents

JOURNAL ARTICLE

Avoided costs: Ontario Hydro's experience

A. Shalaby

Journal:   IEEE Transactions on Power Systems Year: 1989 Vol: 4 (1)Pages: 149-157
JOURNAL ARTICLE

ONTARIO HYDRO'S NUCLEAR FUTURE.

I.F. McRae

Journal:   OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) Year: 1967 Vol: 30 (2)Pages: 110-110
JOURNAL ARTICLE

Ontario hydro's strong charts a new course

Journal:   The Electricity Journal Year: 1993 Vol: 6 (1)Pages: 8-9
JOURNAL ARTICLE

Human Factors in Ontario Hydro's Nuclear Power Stations

George R. Howey

Journal:   IEEE Transactions on Nuclear Science Year: 1981 Vol: 28 (1)Pages: 968-971