The writer's attetion was particularly drawn to a possible working relationship between reservoir and spillway, as hereinafter set forth, by his study of the detention reservoir system while acting as consulting engineer to the Miami Conservancy District on certain occasions during the 30 months prior to the adoption of the Official Plan for flood protection in that district.