Construction Scheduling Optimization by Simulated Annealing M. König and U. Beißert Pages 183-190 (2009 Proceedings of the 26th ISARC, Austin, USA, ISBN 978-0-578-02312-0) Abstract: The process of generating optimized schedules for construction projects is a very time-consuming. For each construction task several execution restrictions, conditions and requirements such as technological dependencies or resource availabilities have to be considered. This leads to a multitude of possible execution orders and consequently to a hard optimization problem. Within this paper the integration of a flexible Simulated Annealing metaheuristic into a constraint-based simulation concept is presented to determine optimized construction schedules. Simulated Annealing approximates the optimized solution by defined temperatures and cooling rates. Both parameters help to define the search process and respectively help to escape from local minima. In the following the Simulated Annealing approach and its implementation are described in detail. Furthermore, the application of Simulated Annealing is demonstrated using an example from construction scheduling. Keywords: No keywords DOI: https://doi.org/10.22260/ISARC2009/0027 Download fulltext Download BibTex Download Endnote (RIS) TeX Import to Mendeley
Yupeng YuanJunyong LiangZ. WuYung Liao
Alex CaveSaeid NahavandiAbbas Z. Kouzani
N.A. Chami. M. KeerthisingheH. M. N. Dilum BandaraNishal A. Samarasekera