Space Scheduling for Construction Progress Planning and Control

Abstract

Space Scheduling for Construction Progress Planning and Control I. D. Tommelien, P. P. Zouein Pages 415-422 (1993 Proceedings of the 10th ISARC, Houston, USA, ISBN 9780444815231, ISSN 2413-5844) Abstract: Space scheduling pertains to allocating the work space to resources associated which activates in a schedule as it changes over time. This is an important aspect of materials management in dynamic environments in which many pieces of equipment, crews, and possibly robots move about, as congestion and interference would seriously hamper production. Advanced space scheduling is then warranted to reduce the need of real time sensing and adjusting. Reactive space scheduling may be needed when problems have arisen and must be alleviated. In any case, space-schedule data must be made available in a timely fashion to all parties who need it. The MovePlan model for dynamic layout planning is described to illustrate the overall significance of space scheduling to construction progress planning. MovePlan uses a two -dimensional representation of space to keep the computational costs associated with space time calculations low. Accordingly, the model does not require a powerful work station, but runs on a laptop computer-and is expected to run on a palm top-that could be easily taken out into the field. MovePlan has been loosely integrated with a space schedule conflict resolver, named ConRes, which delays activities or changes their resource needs to lower the demand in space so-called problematic time intervals. Issues pertaining to data collection for space scheduling, scheduling progress control, and data dissemination are discussed. A futuristic scenario is presented to illustrate the use of palmtop computing for space scheduling on site. Keywords: No keywords DOI: https://doi.org/10.22260/ISARC1993/0054 Download fulltext Download BibTex Download Endnote (RIS) TeX Import to Mendeley

Keywords:
Scheduling (production processes) Computer science Dynamic priority scheduling Schedule Operations research Automated planning and scheduling Distributed computing Real-time computing Engineering Operations management Artificial intelligence

Metrics

5
Cited By
0.00
FWCI (Field Weighted Citation Impact)
0
Refs
0.14
Citation Normalized Percentile
Is in top 1%
Is in top 10%

Citation History

Topics

BIM and Construction Integration
Physical Sciences →  Engineering →  Building and Construction
Advanced Manufacturing and Logistics Optimization
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering

Related Documents

JOURNAL ARTICLE

Effective Progress Scheduling and Control for Construction Projects

Amir Tavakoli

Journal:   Journal of Management in Engineering Year: 1990 Vol: 6 (1)Pages: 87-98
JOURNAL ARTICLE

Progress‐Based Construction Scheduling

Mustafa Pultar

Journal:   Journal of Construction Engineering and Management Year: 1990 Vol: 116 (4)Pages: 670-688
JOURNAL ARTICLE

Construction Scheduling and Progress Control Using Geographical Information Systems

Stephen E. PokuDavid Arditi

Journal:   Journal of Computing in Civil Engineering Year: 2006 Vol: 20 (5)Pages: 351-360
BOOK-CHAPTER

Construction Planning and Scheduling

Year: 2002 Pages: 53-84
BOOK-CHAPTER

Construction Planning and Scheduling

Donn E. Hancher

New directions in civil engineering Year: 2002
© 2026 ScienceGate Book Chapters — All rights reserved.