BOOK-CHAPTER

Quay Crane Scheduling

Frank Meisel

Year: 2009 Contributions to management science Pages: 85-118   Publisher: Springer Nature

Abstract

This chapter deals with the QCSP on the basis of container groups. It is studied as an isolated problem here and functionally integrated into the BACAP in the next chapter. Crane scheduling for container groups has been introduced by Kim and Park (2004). As noted by Moccia et al. (2006), the original QCSP model provided by Kim and Park shows an inaccuracy regarding the detection of crane interference. Unfortunately, even reworked problem formulations still tolerate certain cases of crane interference. A corrected problem formulation and a heuristic solution method have been provided by Bierwirth and Meisel (2006). The model and the heuristic are presented in Section 7.1 and Section 7.2, respectively. In Section 7.3 the QCSP is extended by incorporation of time windows for the cranes. Necessary modifications of the mathematical formulation and the solution method are described. Computational tests follow in Section 7.4. The study on the QCSP is concluded in Section 7.5.

Keywords:
Computer science

Metrics

1
Cited By
0.92
FWCI (Field Weighted Citation Impact)
0
Refs
0.75
Citation Normalized Percentile
Is in top 1%
Is in top 10%

Citation History

Topics

Advanced Manufacturing and Logistics Optimization
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering
Scheduling and Optimization Algorithms
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering
Maritime Ports and Logistics
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering

Related Documents

JOURNAL ARTICLE

Next-generation quay crane scheduling

Omar Abou KasmAli Diabat

Journal:   Transportation Research Part C Emerging Technologies Year: 2020 Vol: 114 Pages: 694-715
JOURNAL ARTICLE

The Quay Crane Scheduling Problem

Noura Al-DhaheriAli Diabat

Journal:   Journal of Manufacturing Systems Year: 2015 Vol: 36 Pages: 87-94
JOURNAL ARTICLE

Quay Crane Scheduling with Vessel Stability

Mohamed Kais MsakniMohammed Al-SalemGhaith RabadiMariam KotachiAli Diabat

Journal:   Transportation research procedia Year: 2018 Vol: 30 Pages: 60-69
JOURNAL ARTICLE

Quay crane scheduling with dual cycling

Dandan WangXiaoping Li

Journal:   Engineering Optimization Year: 2014 Vol: 47 (10)Pages: 1343-1360
JOURNAL ARTICLE

Quay crane scheduling in container terminals

W. C. NgK. L. Mak

Journal:   Engineering Optimization Year: 2006 Vol: 38 (6)Pages: 723-737
© 2026 ScienceGate Book Chapters — All rights reserved.