Precast/Prestressed Concrete Institute
The new St. Anthony Falls Bridge opened to traffic on September 18, 2008, just 339 days after notice to proceed. The 10-lane interstate bridge is a major commuter route in Minneapolis, Minn., and provides the main trucking link through the state. The new 1223-ft-long (372.8 m) bridge features high-strength, high-performance concrete for the post-tensioned box girder superstructure with a precast concrete main span of 504 ft (154 m). Separate parallel structures carry northbound and southbound traf- fic, each comprising two box girders joined together to provide a 90 ft 4 in.–wide (28 m) deck. The team of Flatiron-Manson Joint Venture, with FIGG as the design engineer, was selected by Mn/DOT in a best-value process.