JOURNAL ARTICLE

Sizing and Siting of Battery Energy Storage Systems: A Colombian Case

Alvaro Avendano PenaDavid Romero-QueteCamilo A. Cortés

Year: 2022 Journal:   Journal of Modern Power Systems and Clean Energy Vol: 10 (3)Pages: 700-709   Publisher: Springer Nature

Abstract

This paper presents a mixed-integer linear programming (MILP) formulation for sizing and siting of battery energy storage systems (BESSs). The problem formulation seeks to minimize both operation costs and BESS investment. The proposed model includes restrictions of the conventional security-constrained unit commitment problem, a piece-wise linear approximation to model power losses, and a linear model of hydro generation units. The proposed model is tested in a 6-bus test system and a 15-bus system representing the Colombian power system. For the two studied systems, simulation results show that the reduction of operation costs due to the installation of BESSs compensates the investments, under some of the considered technical cost cases. Additionally, results show that adequate sizing and siting of BESSs reduce renewable energy curtailment in the Colombian power system with high penetration of fluctuating renewable generation.

Keywords:
Sizing Renewable energy Electric power system Linear programming Integer programming Energy storage Reliability engineering Mathematical optimization Computer science Power (physics) Engineering Automotive engineering Operations research Electrical engineering Mathematics

Metrics

17
Cited By
2.54
FWCI (Field Weighted Citation Impact)
0
Refs
0.87
Citation Normalized Percentile
Is in top 1%
Is in top 10%

Citation History

Topics

Microgrid Control and Optimization
Physical Sciences →  Engineering →  Control and Systems Engineering
Smart Grid Energy Management
Physical Sciences →  Engineering →  Electrical and Electronic Engineering
Hybrid Renewable Energy Systems
Physical Sciences →  Energy →  Energy Engineering and Power Technology
© 2026 ScienceGate Book Chapters — All rights reserved.