JOURNAL ARTICLE

A meta-heuristic method for solving scheduling problem: crow search algorithm

Antono AdhiBudi SantosaNurhadi Siswanto

Year: 2018 Journal:   IOP Conference Series Materials Science and Engineering Vol: 337 Pages: 012003-012003   Publisher: IOP Publishing

Abstract

Scheduling is one of the most important processes in an industry both in manufacturingand services. The scheduling process is the process of selecting resources to perform an operation on tasks. Resources can be machines, peoples, tasks, jobs or operations.. The selection of optimum sequence of jobs from a permutation is an essential issue in every research in scheduling problem. Optimum sequence becomes optimum solution to resolve scheduling problem. Scheduling problem becomes NP-hard problem since the number of job in the sequence is more than normal number can be processed by exact algorithm. In order to obtain optimum results, it needs a method with capability to solve complex scheduling problems in an acceptable time. Meta-heuristic is a method usually used to solve scheduling problem. The recently published method called Crow Search Algorithm (CSA) is adopted in this research to solve scheduling problem. CSA is an evolutionary meta-heuristic method which is based on the behavior in flocks of crow. The calculation result of CSA for solving scheduling problem is compared with other algorithms. From the comparison, it is found that CSA has better performance in term of optimum solution and time calculation than other algorithms.

Keywords:
Dynamic priority scheduling Computer science Fair-share scheduling Rate-monotonic scheduling Job shop scheduling Flow shop scheduling Mathematical optimization Two-level scheduling Nurse scheduling problem Scheduling (production processes) Algorithm Mathematics

Metrics

20
Cited By
5.88
FWCI (Field Weighted Citation Impact)
15
Refs
0.97
Citation Normalized Percentile
Is in top 1%
Is in top 10%

Citation History

Topics

Scheduling and Optimization Algorithms
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering
Advanced Manufacturing and Logistics Optimization
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering
Assembly Line Balancing Optimization
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering

Related Documents

JOURNAL ARTICLE

Solving Reactive Power Scheduling Problem using Multi-objective Crow Search Algorithm

Surender Reddy Salkuti

Journal:   International Journal of Advanced Computer Science and Applications Year: 2021 Vol: 12 (6)
JOURNAL ARTICLE

Solving Quadratic Assignment Problem by Using Meta-heuristic Search Method

Iraq T. AbassRawaa AbdulsattarLeong WJ

Journal:   Ibn AL- Haitham Journal For Pure and Applied Science Year: 2023 Vol: 36 (4)Pages: 384-395
JOURNAL ARTICLE

Improved Crow Search Algorithm for Solving Quadratic Assignment Problem

Eman OunHeba Sayed Mohamed Roshdy

Journal:   The Egyptian Statistical Journal/The Egyptian Statistical Journal Year: 2023 Vol: 67 (2)Pages: 17-28
© 2026 ScienceGate Book Chapters — All rights reserved.