JOURNAL ARTICLE

Solving cyclical nurse scheduling problem using preemptive goal programming

V. E. SundariSiti Mardiyati

Year: 2017 Journal:   AIP conference proceedings Vol: 1862 Pages: 030132-030132   Publisher: American Institute of Physics

Abstract

Nurse scheduling system in a hospital is being modeled as a preemptive goal programming problem that is solved by using LINGO software with the objective function to minimize deviation variable at each goal. The scheduling is done cyclically, so every nurse is treated fairly since they have the same work shift portion with the other nurses. By paying attention to the hospital's rules regarding nursing work shift cyclically, it can be obtained that numbers of nurse needed in every ward are 18 nurses and the numbers of scheduling periods are 18 periods where every period consists of 21 days.

Keywords:
Nurse scheduling problem Scheduling (production processes) Computer science Goal programming Job shop scheduling Fair-share scheduling Nursing Rate-monotonic scheduling Mathematical optimization Mathematics Medicine Operating system Schedule

Metrics

4
Cited By
0.91
FWCI (Field Weighted Citation Impact)
4
Refs
0.83
Citation Normalized Percentile
Is in top 1%
Is in top 10%

Citation History

Topics

Management and Optimization Techniques
Social Sciences →  Business, Management and Accounting →  Strategy and Management
Decision Support System Applications
Social Sciences →  Business, Management and Accounting →  Management Information Systems
Optimization and Mathematical Programming
Physical Sciences →  Engineering →  Control and Systems Engineering

Related Documents

JOURNAL ARTICLE

Solving an outpatient nurse scheduling problem by binary goal programming

Sheng-Pen WangYu-Kuang HsiehZheng-Yun ZhuangNai-Chia Ou

Journal:   Journal of Industrial and Production Engineering Year: 2014 Vol: 31 (1)Pages: 41-50
JOURNAL ARTICLE

GOAL PROGRAMMING FOR CYCLICAL NURSE SCHEDULING AT SOMAIYA HOSPITAL

Nilakantan Narasinganallur

Journal:   European Journal of Business Research Year: 2017 Vol: 17 (2)Pages: 19-24
JOURNAL ARTICLE

A Cyclical Nurse Schedule Using Goal Programming

Ruzzakiah Jenal

Journal:   ITB journal of Sciences Year: 2011 Vol: 43 (3)Pages: 151-164
JOURNAL ARTICLE

Solving Nurse Scheduling Problem Using Constraint Programming (CP) Technique

Oluwaseun Modupe AladeAkeem O. AmusatOluyinka Titilayo Adedeji

Journal:   Asian Journal of Research in Computer Science Year: 2019 Pages: 1-8
© 2026 ScienceGate Book Chapters — All rights reserved.