JOURNAL ARTICLE

Generic Scheduling Optimization Model for Multiple Construction Projects

Mohammed S. El-AbbasyAshraf ElazouniTarek Zayed

Year: 2017 Journal:   Journal of Computing in Civil Engineering Vol: 31 (4)   Publisher: American Society of Civil Engineers

Abstract

In the construction industry, contractors usually manage and execute multiple projects simultaneously. Typically, this situation involves sharing different types of resources, including cash, equipment, and manpower. The management of resources becomes a major challenge in these problems. In this situation, contractors are concerned with optimizing a number of different objectives which often conflict with one another. These objectives include duration, total cost, financing cost, required cash, profit, and resource fluctuations. This paper presents the development of a multiobjective scheduling optimization model for multiple construction projects using the fast elitist nondominated sorting genetic algorithm (NSGA-II). The purpose of the proposed model is to obtain optimal trade-offs between different projects' objectives. The scheduling optimization model comprises submodels of project scheduling, resource allocation and leveling, and cash flow forecasting. The optimization model was successfully implemented and tested using different case studies of multiple projects of different sizes. The developed model is expected to help construction companies in solving the problems of prioritizing projects under resource-conflict conditions, allocating limited resources, and optimizing all the projects' multiple objectives under certain funding limits.

Keywords:
Cash flow Scheduling (production processes) Profit (economics) Computer science Operations research Multi-objective optimization Sorting Genetic algorithm Construction management Operations management Engineering Business Economics Finance

Metrics

59
Cited By
6.31
FWCI (Field Weighted Citation Impact)
56
Refs
0.96
Citation Normalized Percentile
Is in top 1%
Is in top 10%

Citation History

Topics

Resource-Constrained Project Scheduling
Social Sciences →  Decision Sciences →  Management Science and Operations Research
BIM and Construction Integration
Physical Sciences →  Engineering →  Building and Construction
Construction Project Management and Performance
Social Sciences →  Decision Sciences →  Management Science and Operations Research

Related Documents

JOURNAL ARTICLE

Linear Optimization Model for Scheduling Repetitive Construction Projects with Multiple Crews

Shahryar MonghasemiMoatassem Abdallah

Journal:   Construction Research Congress 2022 Year: 2022 Vol: 2672 Pages: 461-471
JOURNAL ARTICLE

MULTIOBJECTIVE OPTIMIZATION MODEL FOR SCHEDULING OF CONSTRUCTION PROJECTS UNDER EXTREME WEATHER

Ahmed SenouciSaleh Mubarak

Journal:   Journal of Civil Engineering and Management Year: 2016 Vol: 22 (3)Pages: 373-381
JOURNAL ARTICLE

Scheduling Model for Multiple Constrution Projects

Seung‐Hoon LeeYu-Mi WooHei Duck LeeYong Chil Seo

Journal:   Proceedings of the ... ISARC Year: 2011
© 2026 ScienceGate Book Chapters — All rights reserved.