JOURNAL ARTICLE

Flexible job-shop scheduling problem under resource constraints

Felix T.S. ChanT.C. WongL. Y. Chan

Year: 2006 Journal:   International Journal of Production Research Vol: 44 (11)Pages: 2071-2089   Publisher: Taylor & Francis

Abstract

A flexible job-shop-scheduling problem is an extension of classical job-shop problems that permit an operation of each job to be processed by more than one machine. The research methodology is to assign operations to machines (assignment) and determine the processing order of jobs on machines (sequencing) such that the system objectives can be optimized. This problem can explore very well the common nature of many real manufacturing environments under resource constraints. A genetic algorithm-based approach is developed to solve the problem. Using the proposed approach, a resource-constrained operations-machines assignment problem and flexible job-shop scheduling problem can be solved iteratively. In this connection, the flexibility embedded in the flexible shop floor, which is important to today's manufacturers, can be quantified under different levels of resource availability.

Keywords:
Job shop Job shop scheduling Flow shop scheduling Computer science Mathematical optimization Scheduling (production processes) Industrial engineering Flexibility (engineering) Distributed computing Operations research Engineering Mathematics Schedule

Metrics

117
Cited By
11.99
FWCI (Field Weighted Citation Impact)
26
Refs
0.99
Citation Normalized Percentile
Is in top 1%
Is in top 10%

Citation History

Topics

Scheduling and Optimization Algorithms
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering
Advanced Manufacturing and Logistics Optimization
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering
Assembly Line Balancing Optimization
Physical Sciences →  Engineering →  Industrial and Manufacturing Engineering

Related Documents

JOURNAL ARTICLE

Flexible job-shop scheduling problem with resource recovery constraints

Jobish VallikavungalM. Angélica Salazar–AguilarVincent Boyer

Journal:   International Journal of Production Research Year: 2018 Vol: 56 (9)Pages: 3326-3343
JOURNAL ARTICLE

Dual Resource Constraints Flexible Job Shop Robust Scheduling Method

LIANG ZhizhenWANG Xiaojia

Journal:   Journal of Mechanical Engineering Year: 2024 Vol: 60 (6)Pages: 114-114
JOURNAL ARTICLE

A GRASP algorithm for flexible job-shop scheduling problem with limited resource constraints

M. RajkumarP. AsokanN. AnilkumarTom Page

Journal:   International Journal of Production Research Year: 2010 Vol: 49 (8)Pages: 2409-2423
JOURNAL ARTICLE

Job shop scheduling under resource constraints and varying order priorities

B. M. Worrall

Journal:   Computers & Industrial Engineering Year: 1986 Vol: 11 (1-4)Pages: 199-203
© 2026 ScienceGate Book Chapters — All rights reserved.