JOURNAL ARTICLE

Comparision of photogrammetric point clouds with BIM building elements for construction progress monitoring

Sebastian TuttasAlexander BraunAndré BorrmannUwe Stilla

Year: 2014 Journal:   ˜The œinternational archives of the photogrammetry, remote sensing and spatial information sciences/International archives of the photogrammetry, remote sensing and spatial information sciences Vol: XL-3 Pages: 341-345   Publisher: Copernicus Publications

Abstract

Abstract. For construction progress monitoring a planned state of the construction at a certain time (as-planed) has to be compared to the actual state (as-built). The as-planed state is derived from a building information model (BIM), which contains the geometry of the building and the construction schedule. In this paper we introduce an approach for the generation of an as-built point cloud by photogrammetry. It is regarded that that images on a construction cannot be taken from everywhere it seems to be necessary. Because of this we use a combination of structure from motion process together with control points to create a scaled point cloud in a consistent coordinate system. Subsequently this point cloud is used for an as-built – as-planed comparison. For that voxels of an octree are marked as occupied, free or unknown by raycasting based on the triangulated points and the camera positions. This allows to identify not existing building parts. For the verification of the existence of building parts a second test based on the points in front and behind the as-planed model planes is performed. The proposed procedure is tested based on an inner city construction site under real conditions.

Keywords:
Point cloud Photogrammetry Computer science Building information modeling Process (computing) Schedule Laser scanning Computer graphics (images) Point (geometry) Building construction Artificial intelligence Geometry Engineering Structural engineering Mathematics Laser

Metrics

45
Cited By
9.84
FWCI (Field Weighted Citation Impact)
12
Refs
0.98
Citation Normalized Percentile
Is in top 1%
Is in top 10%

Citation History

Topics

3D Surveying and Cultural Heritage
Physical Sciences →  Earth and Planetary Sciences →  Geology
Remote Sensing and LiDAR Applications
Physical Sciences →  Environmental Science →  Environmental Engineering
Infrastructure Maintenance and Monitoring
Physical Sciences →  Engineering →  Civil and Structural Engineering

Related Documents

JOURNAL ARTICLE

Acquisition and Consecutive Registration of Photogrammetric Point Clouds for Construction Progress Monitoring Using a 4D BIM

Sebastian TuttasAlexander BraunAndré BorrmannUwe Stilla

Journal:   PFG – Journal of Photogrammetry Remote Sensing and Geoinformation Science Year: 2017 Vol: 85 (1)Pages: 3-15
JOURNAL ARTICLE

Building modeling from noisy photogrammetric point clouds

Bo XiongSander Oude ElberinkGeorge Vosselman

Journal:   ISPRS annals of the photogrammetry, remote sensing and spatial information sciences Year: 2014 Vol: II-3 Pages: 197-204
JOURNAL ARTICLE

VALIDATION OF BIM COMPONENTS BY PHOTOGRAMMETRIC POINT CLOUDS FOR CONSTRUCTION SITE MONITORING

Sebastian TuttasAlexander BraunAndré BorrmannUwe Stilla

Journal:   ISPRS annals of the photogrammetry, remote sensing and spatial information sciences Year: 2015 Vol: II-3/W4 Pages: 231-237
JOURNAL ARTICLE

MONITORING WORK PROGRESS OF DAM CONSTRUCTION BASED ON PHOTOGRAMMETRIC POINT CLOUDS AND BIM: PRACTICAL APPROACH TO TEACHING INDUSTRY

Arliandy Pratama ArbadZainal ArifinNunung MartinaE. P. NindyaM. A. Nurfa

Journal:   ˜The œinternational archives of the photogrammetry, remote sensing and spatial information sciences/International archives of the photogrammetry, remote sensing and spatial information sciences Year: 2023 Vol: XLVIII-5/W1-2023 Pages: 1-5
© 2026 ScienceGate Book Chapters — All rights reserved.