Jacques DeuseJ. DuboisR. FannaI. Hamza
The power system of Saudi Consolidated Electricity Western Region (EWR) was characterized during the past few years by a considerable load growth which gave rise to a very high loading of cables and transformers. To avoid, as much as possible, brown- and black-outs following power system faults, an emergency load shedding scheme has been set up. The tuning of this scheme has been made in a detailed model of the power system based on previously developed models and a new load modelling determined from recordings made during disturbed conditions.
J. MechenbierAbraham EllisR. CurtnerSatish J. Ranade
Ardiaty AriefMuhammad Bachtiar NappuZhao Yang Dong
Turaj AmraeeA.M. RanjbarBabak MozafariNasser Sadati
Renuga VerayiahAbdul Rahman MohamedHussain ShareefIzham Zainal Abidin